DRP exam
1.

Place the following four elements of the Business Continuity Plan in the proper order.
A. Scope and plan initiation, plan approval and implementation, business impact assessment, business continuity plan development
B. Scope and plan initiation, business impact assessment, business continuity plan development, plan approval and implementation
C. Business impact assessment, scope and plan initiation, business continuity plan development, plan approval and implementation
D. Plan approval and implementation, business impact assessment, scope and plan initiation, business continuity plan development

2.

Risk assessment is a critical component of the BCP process. As such, which riskassessment method is scenario-driven and does not assign numeric values to specific assets? A. Qualitative Risk Assessment
B. Statistical Weighted Risk Assessment
C. Quantitative Risk Assessment
D. Asset-Based Risk Assessment

3.

Which of the following best describes the concept and purpose of BCP?
A. BCPs are used to reduce outage times.
B. BCPs and procedures are put in place for the response to an emergency.
C. BCPs guarantee the reliability of standby systems.
D. BCPs are created to prevent interruptions to normal business activity.

4.

What are the three goals of a business impact analysis?
A. Downtime estimation, resource requirements, defining the continuity strategy
B. Defining the continuity strategy, criticality prioritization, resource requirements
C. Criticality prioritization, downtime estimation, documenting the continuity strategy D. Criticality prioritization, downtime estimation, resource requirements

5.

Which of the following is the number-one priority for all Business Continuity Plans
(BCPs) and Disaster Recovery Plans (DRPs)?
A. The reduction of potential critical outages
B. The minimization of potential outages…...

Similar Documents

Drp / Ecp

...DRP/ECP January 14, 2014 Content: 1. Roles of the DRP/ECP team 2. Six Resilience layers a) One example of each resilience layer 3. DRP Training 4. Criteria for choosing outside expertise 5. Developing an awareness campaign a) Evaluate one method of awareness campaign Roles of the DRP/ECP Team • Declares a disaster has occurred • Maintain current documentation of the DRP • Responsibility of staff • Testing DRP Six Resilience Layers 1. 2. 3. 4. 5. 6. Strategy Organization Processes Data / Application Technology Facilities / Security Outline of Resilience Layers 1. Strategy • Achieving business goals and objectives • Complete resilience assessment: • Determine the baseline for the organization • Asses vulnerabilities and risk • Success of resilience plan Outline of Resilience Layers 2. Organization • • • • • Executive committee sponsor Details roles and responsibilities Accountabilities Communication Skills important to the organization Outline of Resilience Layers 3. Processes • Creating and sustaining a processes • Alternate processes and procedures • Contingency plan Outline of Resilience Layers 4. Data / Application • • • • • Reliable data provided Alignment of disparate data and application Measurement of Key application Modification of application and data Testing of applications Outline of Resilience Layers 5. Technology • • • • Hardware and software Aligning IT investment with business objective Primary site vs.......

Words: 330 - Pages: 2

Tugas Sindy

........................... 137 DOKTRIN GEREJA Bab 11 Bertumbuh dalam Kristus .......................................................................... 153 Bab 12 Gereja atau Jemaat ..................................................................................... 169 Bab 13 Umat yang Sisa dan Tugasnya ................................................................... 187 Bab 14 Kesatuan dalam Tubuh Kristus .................................................................. 205 Bab 15 Baptisan...................................................................................................... 219 Bab 16 Perjamuan Tuhan ....................................................................................... 233 Bab 17 Karunia Rohani dan Tugas Pelayanan ....................................................... 245 Bab 18 Karunia Nubuat .......................................................................................... 255 DOKTRIN KEHIDUPAN KRISTEN Bab 19 Hukum Tuhan Allah ................................................................................... 273 Bab 20 Hari Sabat................................................................................................... 291 Bab 21 Penatalayanan ............................................................................................ 313 Bab 22 Tingkah Laku Orang Kristen ..................................................................... 317 Bab 23 Pernikahan dan Keluarga ..............................................

Words: 176042 - Pages: 705

Tugas Sim: Shutter Express

...TUGAS Sistem Informasi Manajemen Dosen : Prof. : Dr. Ir. Imam Suroso, Msc(CS) SISTEM INFORMASI PADA SHUTTLE EXPRESS Diajukan Oleh : Erry Wibawa P056134252.51E KELAS E-51 PROGRAM PASCA SARJANA MANAJEMEN DAN BISNIS INSTITUT PERTANIAN BOGOR 2014 Abstrak Persaingan bisnis saat ini semakin ketat, oleh sebab itu Sistem Informasi telah menjadi suatu kebutuhan bagi perusahaan dalam menghadapi kompetitor dalam persaingan dengan perusahaan lain dalam bisnis yang sama. Sistem informasi dapat membantu perusahaan dalam mengembangkan strategi bisnis, proses bisnis, serta mendukung proses pengambilan keputusan yang efektif sehingga dapat membantu perusahaan dalam mencapai tujuan. Sistem informasi yang digunakan oleh perusahaan jasa layanan antar jemput Shuttle Express, dari Top Management hingga supir memakai sistem informasi terpadu dan saling berintegrasi dalam berkomunikasi. sehingga database pelanggan yang dimiliki oleh perusahaan memudahkan pencarian pelanggan yang telah didaftarkan sebelumnya. dengan sistem pengumpulan dan pengolahan database pelanggan yang terpadu, prosedur pemesanan layanan antar shuttle express semakin mudah. Inilah yang menjadi pendorong dalam perkembangan usaha shuttle express. Hal tersebut berdampak bagi kemajuan perusahaan dalam meningkatkan usahanya sehingga dapat bersaing dengan kompetitor dalam bisnis yang sama terbukti dengan semakin eksis keberadaanya. Kata kunci:......

Words: 3854 - Pages: 16

Tugas Besar

...BAB 1 PENDAHULUAN 1.1 Latar Belakang 1.2 Tujuan 1. Untuk mengaplikasikan permainan tebak angka kedalam sebuah program berbahasa C. 2. Untuk memenuhi tugas akhir mata kuliah algoritma dan pemrograman. 1.3 Landasan Teori BAB 2 ISI 3.1 Penjelasan Source Code Program Prepocessor #include<stdio.h> #include<string.h> #include<time.h> #include<conio.h> #include<windows.h> #include <stdio.h> (memasukkan), Baris-baris yang diawali # diolah oleh preprocessor sebelum di compile. Baris-baris itu menyuruh preprocessor untuk meng- include isi dari file stdio.h dalam program. stdio.h adalah standard input output header file, yang mengandung informasi dan deklarasi - deklarasi yang digunakan oleh kompilator untuk penanganan fungsi-fungsi i/o seperti printf, scanf, dsb. #include <string.h> string.h adalah library yang berisi tentang fungsi-fungsi untuk melakukan manipulasi terhadap string. #include<conio.h> conio.h adalah console input output suatu program, yang mengandung informasi dan deklarasi-deklarasi yang digunakan oleh kompilator untuk penanganan fungsi-fungsi seperti getch(). #include<windows.h> windows.h adalah header windows spesifik file untuk bahasa pemrograman C yang berisi deklarasi untuk semua fungsi dalam Windows API, semua makro yang umum digunakan oleh programmer Windows, dan semua jenis data yang digunakan oleh berbagai fungsi dan subsistem. #include<time.h> time.h adalah untuk...

Words: 1603 - Pages: 7

Drp Exam

...1 DRP exam 1. Place the following four elements of the Business Continuity Plan in the proper order. A. Scope and plan initiation, plan approval and implementation, business impact assessment, business continuity plan development B. Scope and plan initiation, business impact assessment, business continuity plan development, plan approval and implementation C. Business impact assessment, scope and plan initiation, business continuity plan development, plan approval and implementation D. Plan approval and implementation, business impact assessment, scope and plan initiation, business continuity plan development 2. Risk assessment is a critical component of the BCP process. As such, which riskassessment method is scenario-driven and does not assign numeric values to specific assets? A. Qualitative Risk Assessment B. Statistical Weighted Risk Assessment C. Quantitative Risk Assessment D. Asset-Based Risk Assessment 3. Which of the following best describes the concept and purpose of BCP? A. BCPs are used to reduce outage times. B. BCPs and procedures are put in place for the response to an emergency. C. BCPs guarantee the reliability of standby systems. D. BCPs are created to prevent interruptions to normal business activity. 4. What are the three goals of a business impact analysis? A. Downtime estimation, resource requirements, defining the continuity strategy B. Defining the continuity strategy, criticality prioritization, resource requirements C.......

Words: 5033 - Pages: 21

Drp Exam

...DRP exam 1. Place the following four elements of the Business Continuity Plan in the proper order. A. Scope and plan initiation, plan approval and implementation, business impact assessment, business continuity plan development B. Scope and plan initiation, business impact assessment, business continuity plan development, plan approval and implementation C. Business impact assessment, scope and plan initiation, business continuity plan development, plan approval and implementation D. Plan approval and implementation, business impact assessment, scope and plan initiation, business continuity plan development 2. Risk assessment is a critical component of the BCP process. As such, which riskassessment method is scenario-driven and does not assign numeric values to specific assets? A. Qualitative Risk Assessment B. Statistical Weighted Risk Assessment C. Quantitative Risk Assessment D. Asset-Based Risk Assessment 3. Which of the following best describes the concept and purpose of BCP? A. BCPs are used to reduce outage times. B. BCPs and procedures are put in place for the response to an emergency. C. BCPs guarantee the reliability of standby systems. D. BCPs are created to prevent interruptions to normal business activity. 4. What are the three goals of a business impact analysis? A. Downtime estimation, resource requirements, defining the continuity strategy B. Defining the continuity strategy, criticality prioritization, resource requirements C. Criticality prioritization,......

Words: 5034 - Pages: 21

Latihan Soal Drp

...DRP exam 1. Place the following four elements of the Business Continuity Plan in the proper order. A. Scope and plan initiation, plan approval and implementation, business impact assessment, business continuity plan development B. Scope and plan initiation, business impact assessment, business continuity plan development, plan approval and implementation C. Business impact assessment, scope and plan initiation, business continuity plan development, plan approval and implementation D. Plan approval and implementation, business impact assessment, scope and plan initiation, business continuity plan development 2. Risk assessment is a critical component of the BCP process. As such, which riskassessment method is scenario-driven and does not assign numeric values to specific assets? A. Qualitative Risk Assessment B. Statistical Weighted Risk Assessment C. Quantitative Risk Assessment D. Asset-Based Risk Assessment 3. Which of the following best describes the concept and purpose of BCP? A. BCPs are used to reduce outage times. B. BCPs and procedures are put in place for the response to an emergency. C. BCPs guarantee the reliability of standby systems. D. BCPs are created to prevent interruptions to normal business activity. 4. What are the three goals of a business impact analysis? A. Downtime estimation, resource requirements, defining the continuity strategy B. Defining the continuity strategy, criticality prioritization, resource requirements C. Criticality prioritization,......

Words: 5034 - Pages: 21

Drp Exam

...DRP exam 1. Place the following four elements of the Business Continuity Plan in the proper order. A. Scope and plan initiation, plan approval and implementation, business impact assessment, business continuity plan development B. Scope and plan initiation, business impact assessment, business continuity plan development, plan approval and implementation C. Business impact assessment, scope and plan initiation, business continuity plan development, plan approval and implementation D. Plan approval and implementation, business impact assessment, scope and plan initiation, business continuity plan development 2. Risk assessment is a critical component of the BCP process. As such, which riskassessment method is scenario-driven and does not assign numeric values to specific assets? A. Qualitative Risk Assessment B. Statistical Weighted Risk Assessment C. Quantitative Risk Assessment D. Asset-Based Risk Assessment 3. Which of the following best describes the concept and purpose of BCP? A. BCPs are used to reduce outage times. B. BCPs and procedures are put in place for the response to an emergency. C. BCPs guarantee the reliability of standby systems. D. BCPs are created to prevent interruptions to normal business activity. 4. What are the three goals of a business impact analysis? A. Downtime estimation, resource requirements, defining the continuity strategy B. Defining the continuity strategy, criticality prioritization, resource requirements C. Criticality prioritization,......

Words: 5034 - Pages: 21

Drp Exam

...DRP exam 1. Place the following four elements of the Business Continuity Plan in the proper order. A. Scope and plan initiation, plan approval and implementation, business impact assessment, business continuity plan development B. Scope and plan initiation, business impact assessment, business continuity plan development, plan approval and implementation C. Business impact assessment, scope and plan initiation, business continuity plan development, plan approval and implementation D. Plan approval and implementation, business impact assessment, scope and plan initiation, business continuity plan development 2. Risk assessment is a critical component of the BCP process. As such, which riskassessment method is scenario-driven and does not assign numeric values to specific assets? A. Qualitative Risk Assessment B. Statistical Weighted Risk Assessment C. Quantitative Risk Assessment D. Asset-Based Risk Assessment 3. Which of the following best describes the concept and purpose of BCP? A. BCPs are used to reduce outage times. B. BCPs and procedures are put in place for the response to an emergency. C. BCPs guarantee the reliability of standby systems. D. BCPs are created to prevent interruptions to normal business activity. 4. What are the three goals of a business impact analysis? A. Downtime estimation, resource requirements, defining the continuity strategy B. Defining the continuity strategy, criticality prioritization, resource requirements C. Criticality prioritization,......

Words: 5034 - Pages: 21

Contoh Laporan Drp

................................................. 3 2. Traceroute ............................................................................................................................... 16 3. Analisa Aset ............................................................................................................................ 18 4. Network Vulnerabilities Assessment .................................................................................. 25 5. Service Level Requirement .................................................................................................. 27 6. Bussiness Impact Analysis(BIA) .......................................................................................... 30 7. Disaster Recovery Plan (DRP) ............................................................................................ 32 i Pendahuluan Pada zaman yang modern seperti sekarang ini, di mana teknologi berkembang dengan pesat, tindak criminal pun juga turut meningkat. Semakin canggih suatu teknologi, semakin canggih juga cara yang dipakai oleh pelaku cyber criminal untuk merusak suatu teknologi tersebut. Dengan pikiran tersebut, kita sebagai seseorang atau kelompok yang sedang menjalankan suatu perusahaan yang berbasiskan IT, perlu menjaga dengan baik aset perusahaan kita, baik itu informasi, database, keuangan, hardware, dan lain sebagainya. Oleh karena itu dibuatkanlah suatu rencana penanggulangan bencana (Disaster Recovery Plan) yang di mana kita......

Words: 6026 - Pages: 25

Drp Verses Bcp

... DRP versus BCP Disaster Recovery Plan The Disaster Recovery Plan or DRP is a test of a system back up procedures and practice. DRP is something that is rehearsed before a disaster happens in order to prepare for an event that might leave a company crippled or without a service. In the event something should happen to a company such as an internet connection going down, the crash of a server, or loss of power it is important to what to do in the event of an emergency. Loss of any one of these system could cause a company loss of revenue. DRP needed to be practiced, rehearsed many times periodically to assure that everyone involved knows what to do. Practice makes perfect, the more practice and rehearsal is done the easier and quicker it will be for someone to implement the steps needed to complete the recovery plan. It’s always best to practice these steps during non-peak hours. Typically DRP testing would be done overnight, on weekends, or holidays. It’s important to test the DRP system and process to ensure that the backup system is functioning properly, and the steps taken to get there are effective. Ideally this would all be automated, but not always possible. Step by step instructions and procedures are what make up the DRP, primarily its intended for key departments the most important being the IT department. These procedures and instructions are what will recover critical business systems in the event of a disaster. Making sure they are relevant, work properly,......

Words: 875 - Pages: 4

Tugas Proyek Matematika Ll

...TUGAS PROYEK GRADIEN KELOMPOK VIII Disusun oleh : Adik Niko Heri Mukti Kusuma (5215122652) Asmara Yoga (5215122687) Lidya Setiawati (5215122680) Mochammad Aldi Mauludin (5215122659) Urfi Muthiah (5215122677) Yusuf Syani (5215122628) PENDIDIKAN TEKNIK ELEKTRONIKA FAKULTAS TEKNIK UNIVERSITAS NEGERI JAKARTA 2013/2014 27 Mei 2013 [M A T E M A T I K A II] KATA PENGANTAR Puji syukur kehadirat Tuhan Yang Maha Kuasa.Berkat rahmat, nikmat, serta limpahan karuniaNya Makalah Proyek Gradien ini dapat diselesaikan tepat pada waktunya Penulisan makalah proyek ini sebagai sarana pemenuhan tugas mata kuliah pendidikan matematika II, pendidikan teknik elektronika semester 098 tahun pelajaran 2013/2014 Dalam penyelesaian makalah proyek ini penulis banyak mengalami kesulitan karena kurangnya materi yang diperoleh.Namun berkat bantuan dari berbagai pihak,akhirnya makalah ini dapat diselesaikan.Oleh karena itu, penulis mengucapkan terima kasih kepada 1. Dr.Ir.Rusmono sebagai Dosen Pembimbing Matematika II 2. Tim sebagai pencari informasi tambahan Penulis menyadari makalah proyek ini masih jauh dari sempurna.Oleh karena itu,penulis meminta kritik dan saran yang membangun makalah proyek ini menjadi lebih baik. Semoga makalah ini dapat bermanfaat bagi yang membaca , khususnya penulis. Jakarta,27 mei 2013 PENULIS GRADIEN ii 27 Mei 2013 [M A T E M A T I K A II] DAFTAR ISI Cover..................

Words: 2665 - Pages: 11

Drp Quis

...DRP exam 1. Place the following four elements of the Business Continuity Plan in the proper order. A. Scope and plan initiation, plan approval and implementation, business impact assessment, business continuity plan development B. Scope and plan initiation, business impact assessment, business continuity plan development, plan approval and implementation C. Business impact assessment, scope and plan initiation, business continuity plan development, plan approval and implementation D. Plan approval and implementation, business impact assessment, scope and plan initiation, business continuity plan development 2. Risk assessment is a critical component of the BCP process. As such, which riskassessment method is scenario-driven and does not assign numeric values to specific assets? A. Qualitative Risk Assessment B. Statistical Weighted Risk Assessment C. Quantitative Risk Assessment D. Asset-Based Risk Assessment 3. Which of the following best describes the concept and purpose of BCP? A. BCPs are used to reduce outage times. B. BCPs and procedures are put in place for the response to an emergency. C. BCPs guarantee the reliability of standby systems. D. BCPs are created to prevent interruptions to normal business activity. 4. What are the three goals of a business impact analysis? A. Downtime estimation, resource requirements, defining the continuity strategy B. Defining the continuity strategy, criticality prioritization, resource......

Words: 5034 - Pages: 21

Tugas

...keandalan laporan (keuangan dan operasional) serta kepatuhan kepada kebijakan, standar dan peraturan yang berlaku. Kadang beberapa literatur menyebut teknik ini juga dengan nama lain misalnya RCSA atau “Risk and Control Self Assessment”. * Peran Internal Audit terkait Manajemen Risiko Institute of Internal Auditors (IIA), menjelaskan kegiatan internal audit sebagai kegiatan independen yang mendukung pencapaian sasaran organisasi, dan aktivitas konsultasi yang dirancang untuk memberikan nilai tambah dan memperbaiki operasi organisasi. Aktivitas ini membantu organisasi untuk mencapai tujuannya dengan membawa pendekatan sistematik dan disiplin untuk mengevaluasi dan meningkatkan efektivitas manajemen risiko, pengendalian, dan proses governance. Tugas inti auditor internal berkaitan dengan manajemen risiko adalah untuk memberikan kepastian bahwa kegiatan manajemen risiko telah berjalan dengan efektif dalam memberikan jaminan yang wajar terhadap pencapaian sasaran organisasi. Dua cara penting untuk menjalankan tugasnya adalah dengan: 1. memastikan bahwa risiko utama dari bisnis telah ditangani dengan baik; dan 2. memastikan bahwa kegiatan manajemen risiko dan pengendalian internal telah berjalan dengan efektif. Kasus Risiko di dunia perbankan sebenarnya sudah lama disadari oleh para manajer bank. Tetapi sejak mencuatnya sejumlah kasus besar belakangan ini semakin menyadarkan kita mengenai betapa pentingnya manajemen risiko untuk mencegah terulangnya kasus serupa pada......

Words: 1084 - Pages: 5

Bcp and Drp

...includes an organizational disaster recovery plan (DRP) for technical systems restoration. A DRP serves to outline the process and procedures needed by an organization’s information technology team when restoring critical technical systems after a crisis (Lindros & Tittel, 2014). The university is hoping to become as a center of academic excellence through a certification presented by the National Security Agency (NSA). With this certification, the school may see the possibility of increased funding from the government and external organizations. Additionally, other designations may include, but not limited to, research awards, the hiring of esteemed faculty members and the increase in enrollment. The organization will have to develop and show the execution of their ECP and DRP, to achieve the NSA certification. To kick this off the school must first assess several areas before structuring the plans. The university must identify what the program will encompass, key areas to focus on in the organization, critical services offered by the organization, and dependence on internal and external entities (Lindros & Tittel, 2014). Furthermore, the school must settle on the downtime requirements and the methods used to maintain full operation in spite of adverse situations (Lindros & Tittel, 2014). This presentation will shape the justification of why it is imperative the University adopts and executes both an ECP and DRP. We will first explain the position......

Words: 1369 - Pages: 6