Case Study 3: Purchasing Ethics
MKTG 6523 Sourcing & Procurement
LaQuita L. Davis
Arkansas State University
Dr. John Mello
November 3, 2013

Purchasing Ethics
Scenario 1
1.) What should Bryan do about the clock?
Bryan should explain to his wife Nina what could happen if his boss found out about the clock. He should explain the ethics policy set in place at his job and that he could lose his job if word got back of them accepting the clock. Finally he should explain to her that he is looking out for the company’s reputation as well and wants to behave in an ethical manner. Stressing the fact that “ethical buyers do not accept outside gifts or favors that violate their firm’s ethics policy”( Handfield, Giunipero, Monczka, & Patterson, 2011). Another approach would be to direct her to the standard guidelines in the code of ethics developed by the Institute of Supply Management (ISM).
2.) What does the Institute of Supply Management (ISM) code of ethics say about accepting supplier favors and gifts? The ISM code of ethics strictly frowns upon accepting gifts or favors from potential suppliers. “People engaged in purchasing should not accept from any supplier or prospective supplier any money, gift, or favor that might influence, or be suspected of influencing, their buying decisions” (Handfield, Giunipero, Monczka, & Patterson, 2011).Any gifts received should be returned immediately and as discreetly as possible to avoid embarrassment on the supplier’s part. If embarrassment does occur a buyer should still not feel obligated to accept the gift or favor because of its effect on the suppler.

3.) Why do you think the supplier sent the clock to Bryan’s home and addressed to his wife? It seems that the supplier was trying to be sneaky. Mr. McEnroe probably assumed that if he sent it in Bryan’s wife, Nina’s name and to his home instead of the…...

Similar Documents

Purchasing Cycle

...IV. Purchasing Cycle Ordering materials, supplies and services The Purchasing Group is responsible for receiving Purchase Order request forms from different departments. Usually, the majority of orders come from Planning Department because they use JIT inventory system to schedule production runs. Once the order request is approved by upper management, the purchaser will choose a vendor and decide if a Purchase Order (PO) is needed. Practically, PO will not be required for minor purchases that are less than $1,000 such as office supplies, lunches etc. For those purchases, the purchaser will contact the preferred vendors to place orders and pay them with the American Express credit card. The Purchase Order request forms are then completed for filing purposes. If the purchase exceeds $1,000, a PO is created. The purchaser will select a vendor, send them the PO and receive a confirmation number. If the shipment is delayed, the purchaser will contact backup vendors for immediately needed parts. Receiving Deliveries from vendors are handled by the Receiving Department. The docking clerk checks Bill of Lading (BOL) and Packing Slip for correct shipments. All incoming deliveries with right addresses are received at the dock. After blind receiving the products, the raw material handler will compare the actual receipt of goods with the quantity of goods on BOL and packing slip. All shipments are subject to inspection for any defected items. The raw material handler will notify......

Words: 476 - Pages: 2

Purchasing an Mri

...department overhead will include scheduling, billing, nursing support, office equipment, and the salary of the MRI radiology technician, which is around $65,000 a year. The cost per year to operate the new MRI machine would be around $400,000 (Gayler 2007). Because the old MRI machine is larger, we will incur construction costs to update the electrical panels. Heating/air conditioning and ventilation may need to be redone, and new ceiling-mounted equipment and flooring will have to be calculated for different weight measurements and the installation of new x-ray shielding. This is all based on the new state and federal guidelines requirement changes for x-ray equipment (Gayler, 2007). The return on investment (ROI) for purchasing an MRI machine is significant once the upfront cost has been paid. The going rate for doing an MRI procedure ranges around $2,500–$4000, so it will be an easy undertaking for the hospital to recover the cost of the MRI. The hospital is also able to charge for the MRI radiologist to analyze the MRI scan at a usual cost of around $450. This is also another revenue generator for the hospital and contributes to the ROI of the MRI machine. General Electric, which manufactures the MRI machine, has indicated that the equipment has a life span of up to 12 years, but the initial warranty is only good for 6 years (Signa HDxt 3.OT, 2013). One of the significant advantages of the new MRI machine is that it is a great diagnostic tool......

Words: 930 - Pages: 4

Plan Purchasing

...Plan Purchasing Why do organisations commit to resource and time to evaluate suppliers before making a supplier selection decision? Selecting suppliers is one of the most important activities performed by companies. Mistakes during this process can lead to damaging and expensive problems like delivery delays and quality issues, and long-lasting consequences. Choosing the right supplier is strategically important when an organisation tries to reduce its supplier base to maximise costs and procurement processes. The risks that come with a reduced supplier base (over dependency on a single supplier, danger of supply disruption, difficulties in finding a new supplier) make the selection process a vital business decision. The possible ways that purchasing becomes aware of the need to evaluate and select a supplier. The decision to start a supplier selection and evaluation process follows the recognition of a requirement or need. This can come in many different ways: - New products development plans: The purchasing might have an early insight into new product development plans where the preliminary specifications about materials, service or processes required are disclosed. - Poor supplier performance: When the supplier’s performances are poor it becomes necessary to source a new supplier that can efficiently meet the organisation`s requirements. - When current suppliers have insufficient capacity: If the actual supplier is not able to......

Words: 920 - Pages: 4

Capital Purchasing

...specific time limit but have such a limited space. Productivity growth also helps businesses to be more profitable. According to Sue Grossbauer (2001), before a purchasing decision is made for capital item, there are seven steps should be followed: The first step is determined a need, typically, the dietary manager and other staff members in the dietary department recognized the need for equipment purchases. There may be recurring problems; existing equipment may break down and may not be worth repair costs, manufacturers may introduce new items of great interest or benefit to the facility; or new services models may be pending. The second step is consider the budget, since the purchase of large equipment items will involve significant expense, those items general must be included and approved in a capital budget separate from the department’s operating budget. The third step is, investigate options, a dietary manager may investigate options with a number or suppliers, or with a manufacturer’s representative a starting point is any known requirements. From this, a dietary management can check available sources compare features and specifications, and refine needs list. The fourth step is, Consult with others in the organization, facility staff play a role in the equipment purchase. In large facilities with a purchasing department, personnel with this responsibility may obtain general information from equipment suppliers about potentially useful items, and help develop......

Words: 1235 - Pages: 5

Purchasing Strategy

...government regulation which led to the increase of excise duties levied on the alcoholic products classified as potentially harmful. Outsourcing also helped to improve efficiency and meet changing consumer needs since non core activities take up a lot of management time allowing them to concentrate on consumer needs. The company also established a shared services centre , a hub which would perform given functions for the whole company such as financial accounting and reporting activities for the group. The procurement and information systems services are also centralized therefore reducing costs associated with duplication of services among the subsidiaries. From the perspective of purchasing, a major implication of cost leadership strategy at business unit level was an emphasis on cost reduction. Purchasing strategies were therefore revised as price became paramount in the negotiations with suppliers in the outsourcing strategy process. Supplier relationship management and performance monitoring systems became vital as was reliability of delivery which needed to be guaranteed. Make (do) or buy approach was a strategic choice which had to be made in the procurement of the identified services. The company engaged the procurement function to source for cheaper and more readily available sorghum instead of barley in beer production. Differentiation:(unique products and services offering) East African Breweries applied differentiation strategy by matching consumer......

Words: 1901 - Pages: 8

Purchasing

...Evolution of PURCHASING YEAR II SEMESTER I INETRNATIONAL TRANSPORTATION MANAGEMENT AND LOGISTICS BATCH (08) * SUBJECT NAME - INTRODUCTION TO LOGISTICS * ASSIGNMENT - EVOLUTION OF PURCHASING * GROUP NO - (04) * GROUP MEMBERS - SACHINTHA SIRIWARDENE (0021) UJITH PRAMODA (0022) SANDESHA KATIPEARACHCHI () HESHAN WIJETHILAKA () GIHAN FERNANDO () NILANKA DILSHANI () CONTENT (1.0) What is purchasing? (2.0) Purchasing Process. (3.1) Recognizing a need (3.2) Identifying a Supplier (3.3) Qualifying and Placing an order (3.4) Monitoring and managing the delivery process (3.5) Evaluating the purchase and the supplier (3.0) History of Purchasing. (4.6) Origins of purchasing/Procurement (4.7) Procurement developments in ancient history. (4.0) Purchasing Goals. (5.8) Broad purchasing goals (5.9) Different purchasing goals and their priorities (5.0) Importance of purchasing for an Organization. (6.0) New Trends in purchasing. (7.10) e-Purchasing (7.11) Values of e-Purchasing (7.12) Procurement outsourcing (7.13) Values of Procurement outsourcing (7.0) Conclusion. (1.0) What is Purchasing? For most organization purchasing means buying goods to resell or carry out operations or to manufacture products. “Purchasing......

Words: 1395 - Pages: 6

Purchasing Ethics

...Purchasing Ethics CASE Scenario 1 Bryan Janz was just arriving back from lunch when his office phone rang. It was his wife, Nina, calling from home. Nina told Bryan that FedEx had just delivered a package addressed to her. The package contained a beautiful clock now sitting over the fireplace. In fact, Nina said, “the clock looks absolutely beautiful on our living room fireplace”. Thinking the clock was from a family member, Bryan asked who sent the present. She said she did not recognize the name—the clock was from Mr. James McEnroe. Bryan immediately told Nina that she had to repack the clock because it was from a supplier who has been trying to win business from Bryan’s company. They definitely could not accept the clock. Nina was very upset, and responded that the clock was perfect for the room and, besides, the clock came to their home, not to Bryan’s office. Because of Nina’s attachment to the clock, Bryan was unsure about what to do. Assignment 1. What should Bryan do about the clock? 2. What does the Institute of Supply Management (formerly the NAPM) code of ethics say about accepting supplier favors and gifts? 3. Why do you think the supplier sent the clock to Bryan’s home and addressed it to his wife? 4. Does the mere act of sending the clock to Bryan mean that Mr. McEnroe is an unethical salesperson? Scenario 2 Lisa Jennings thought that at long last, her company, Assurance Technologies, was about to win a major contract......

Words: 1322 - Pages: 6

Purchasing

...Electronic procurement (e-procurement) is the process of electronically purchasing the goods and services needed for an organization’s operation. It entails implementing electronic means to process publish exchange and store information concerning procurement without a paper medium. Hence it consists of publishing calls for tenders on the internet, sending out documents and specifications consultation files for companies, binding tender forms, etc   38 2.4.2 Factors/ drivers for adoption e-procurement In general a number of factors might hinder or influence the adoption of e- procurement in an organization including; inadequate technological infrastructure, lack of skilled personnel, inadequate technological infrastructure of partners, lack of integration with business, implementation costs, company culture, inadequate  business processes to support e-procurement, regulatory and legal controls, security, co-operation of business partners capacity, inadequate e-procurement solutions, upper management support (Chipiro, 2009). Shakir et all, (2007) identified several driver/barriers for adoption of e-procurement;   Economic: Little benefit to vendors, vendors’ concerns about costs, vendors’ fear of competitive bidding because of its adverse effect on price, insufficient internal resources to support e-procurement  Operational: vendors’ concerns about required changes in work processes, lack of skilled personnel, particularly when the vendor is required to  populate, update,...

Words: 3170 - Pages: 13

Purchasing

...INTM 443/543 PURCHASING FALL 2013 RESEARCH PAPER GUIDELINES The research paper will replace a final exam. The paper will be due by November 26th, submitted via Blackboard. Grades for papers received after November 26th will be reduced by 10 points per day (100 points maximum grade). Topics for the research paper may be one of the following: 1. A discussion with your point of view on a current purchasing or supply management issue, for example: - What should purchasing managers be doing to deal with fluctuating commodity prices in the future? - How has e-Procurement impacted Purchasing’s approach to negotiating with suppliers? - Should companies continue to use outsourcing as a key purchasing strategy? - What are companies doing to create sustainable purchasing and supply management processes and products? 2. Research on how a specific company has developed new strategies and/or techniques to its supply chain and supplier relationships. IBM, Wal Mart, or Proctor & Gamble might be good choices. 3. Research on a significant purchasing issue from the past. The story of I. Lopez who headed up Purchasing at both Volkswagen and then General Motors is a good example. Topics must be approved by me in advance. Submit a brief statement of the topic and what you intend to do in terms of fact gathering, literature investigation, etc. Topics should be submitted by October 1st. Your paper should be 8 -...

Words: 343 - Pages: 2

Sustainabe Purchasing

...Sustainable Purchasing Terrence Damp All businesses need inputs in order to be able to operate. These might be physical inputs, such as raw materials, like engine components for a car manufacturer. They may also be service-based, such as specialist engineering consultancy when trailing new technology or distribution services for a high street retailer. It is vital that inputs not only meet the required and reliability standards, but also those they are competitively priced. Supply chain management is a set of approaches utilized to efficiently integrate suppliers, manufactures, warehouses and stores, so that merchandise is produced and distributed at the right quantities, to the right locations and at the right time, in order to minimize system wide costs while satisfying service level requirements. For the oil and gas industry with its high levels of risk, the Chartered Institute of Purchasing & Supply (CIPS) is providing training to improve the efficiency and effectiveness of purchasing and supply. OPITO, the focal point for skills, learning and development in the oil and gas industry, undertook a labour market survey of the industry which identified a sector wide skills shortage. Oil & Gas UK then undertook a supply chain specialist for the oil and gas industry. The responsibility of an organization, the impact of its decisions and activities on society and the environment, resulting in transparent and ethical behavior which: Contributes to sustainable development,......

Words: 1125 - Pages: 5

Centralized Purchasing

...Purchasing Centralized purchasing is when a company’s corporate office takes control of all the purchasing for the business.  This allows for central management and volume purchases that lead to better prices and terms as well as the ability to work with larger suppliers. This central control enables more efficient inventory control, lower staffing costs and a decrease in overheads. Staff also benefit with better training and support and the ability to build better relationships with suppliers. Many large companies either have experienced quick growth through mergers and acquisitions, and they often have several separate purchasing departments that are each responsible for purchasing a group of products. In a company with a local purchasing structure, departments purchase their own materials and supplies with minimal oversight from corporate. Some companies adopt a hybrid structure, in which some classes of items are purchased centrally and some are purchased locally; or a spending limit is given, with local managers responsible for purchasing goods up to a certain dollar amount. There are advantages to both centralized and a local purchasing program. A centralized program allows for fewer overheads, there is no a longer duplication of staff and the purchasing procedures are standardized. Centralized purchasing may bring better pricing and discounts based on volumes and freight charges and handling may be reduced with better volumes and fewer deliveries. Buyers......

Words: 1047 - Pages: 5

Purchasing Procurment

...Purchasing Procurement at Northwell Health By INF 336: Project Procurement Management Instructor: Michael Chu February 7, 2016 In any business there is always the need to acquire goods and services from outside of your business. There is no company that can do it all themselves. No matter if you are a new business starting or a veteran in the industry there is going to be a time when some aspect of your business will be outsourced to another company. The healthcare industry is no stranger to this type of business transaction. The healthcare system utilizes many relationships between numerous distributors from patient gowns to surgical equipment a hospital needs to have a supplier for all kinds of goods and services to keep it going. Northwell Health is a large healthcare system that utilizes distributor relationships for various goods. For the purposes of this paper the administrative portion of the healthcare system will be used. Depending on what is needed in the different departments of the administrative locations Northwell Health relies on that distributor to get them the supplies they need. Most of the purchasing trends that go on in administrative areas are the usual pens, paper, ink cartridges and at times computer monitors, chairs, desks. For the most part the department can anticipate what supplies will be needed by keeping a log of supplies that need to be ordered and allowing all employees to put items they need on the log. Integrated suppliers try to be...

Words: 679 - Pages: 3

Purchasing

...Case 1-3: Southeastern University Situation: * Heather Sloman is a buyer in the purchasing department for Southeastern University * Walter bought a $14,000 piece of equipment without following standard university purchasing policies * Purchasing is centralized and responsible for negotiating with suppliers, signing contracts with suppliers, and supervising the execution of contracts * Supplier is not on the approved supplier list and quotes from three approved suppliers are less than the one Walter chose or involve better service * $75 million spend Basic Issues 1. Acceptable suppliers 2. Price, quality, service 3. Budgeting 4. Authority for internal users/following purchasing policies 5. Purchasing for a public institution/service organization Tasks: * Define alternatives * Keep the machine and pay for the supplier. * Return the equipment and negotiate the cancellation penalty * Go back to the supplier and use the quotations to negotiate a lower price * Improve the purchasing process to avoid unauthorized purchases * Obtain information from unapproved supplier via RFQ Actions: * Evaluate unapproved supplier with RFQ * Accept the supplier * Acquire purchase information * Decide whether to add supplier to list of approved suppliers * Reject the supplier * Return the equipment * Negotiate the cancellation penalty. * Consider......

Words: 524 - Pages: 3

Purchasing Management

... Table of Contents Cover Title Page Copyright Learning System Table of Contents Chapter 1. Purchasing and Supply Management Chapter 2. Supply Strategy Chapter 3. Supply Organization Chapter 4. Supply Processes and Technology Chapter 5. Make or Buy, Insourcing, and Outsourcing Chapter 6. Need Identification and Specification Chapter 7. Quality Chapter 8. Quantity and Inventory Chapter 9. Delivery Chapter 10. Price Chapter 11. Cost Management Chapter 12. Supplier Selection Chapter 13. Supplier Evaluation and Supplier Relations Chapter 14. Global Supply Management Chapter 15. Legal and Ethics Chapter 16. Other Supply Responsibilities Chapter 17. Supply Function Evaluation and Trends Other Facts101 Titles 2 3 Title Textbook Outlines, Highlights, and Practice Quizzes Purchasing and Supply Management by P. Fraser Johnson, 14th Edition All "Just the Facts101" material written or prepared by Cram101 Publishing 4 Copyright Information Just the Facts101 ®, Cram101® Textbook Outlines, Cram101 e-StudyGuides and Cram101.com are Content Technologies Inc. publications and services. All notes, highlights, reviews, and practice tests are written and or prepared by Content Technologies, Inc. and Cram101 Publishing. Copyright © 2014 by Content Technologies, Inc. All rights reserved. eISBN 9781490281032 E-5 23479 www.Cram101.com 5 LearningSystem "Just the Facts101" is a Cram101 publication and tool designed to give you all the......

Words: 26956 - Pages: 108

Purchasing Ethics

...Purchasing Ethics CASE Scenario 1 Bryan Janz was just arriving back from lunch when his office phone rang. It was his wife, Nina, calling from home. Nina told Bryan that FedEx had just delivered a package addressed to her. The package contained a beautiful clock now sitting over the fireplace. In fact, Nina said, “the clock looks absolutely beautiful on our living room fireplace”. Thinking the clock was from a family member, Bryan asked who sent the present. She said she did not recognize the name—the clock was from Mr. James McEnroe. Bryan immediately told Nina that she had to repack the clock because it was from a supplier who has been trying to win business from Bryan’s company. They definitely could not accept the clock. Nina was very upset, and responded that the clock was perfect for the room and, besides, the clock came to their home, not to Bryan’s office. Because of Nina’s attachment to the clock, Bryan was unsure about what to do. Assignment 1. What should Bryan do about the clock? 2. What does the Institute of Supply Management (formerly the NAPM) code of ethics say about accepting supplier favors and gifts? 3. Why do you think the supplier sent the clock to Bryan’s home and addressed it to his wife? 4. Does the mere act of sending the clock to Bryan mean that Mr. McEnroe is an unethical salesperson? Scenario 2 Lisa Jennings thought that at long last, her company, Assurance Technologies, was about to win a major contract......

Words: 1322 - Pages: 6